A construction loan does not settle in one go. If you are buying land, the land usually settles first, then the lender releases money to your builder in stages as work is completed. If you already own the land, there is no land settlement and the first event is the initial payment to the builder.
If you are planning to build in Mermaid Beach, knowing how those stages work helps you budget for the build and avoid delays on site. This article explains what happens at each point and what to organise before the first payment is due.
What Does Settlement Mean on a Construction Loan?
On a construction loan, the lender makes staged payments to your builder as work is finished. If you are buying land, the lender also pays for the land at settlement. The loan is not paid out as a single lump sum for a finished home.
If you already own the land, there may be no land settlement at all, and the first event is the initial progress payment. If you are buying land and building under separate contracts, the land purchase settles first and the build begins afterwards. A land and construction package may combine both under one arrangement or use separate land and build contracts, so confirm the structure with your lender.
Our construction loans page covers the loan structure in more detail.
How the Construction Draw Schedule Works
A construction draw schedule sets out the stages at which your lender releases money to the builder, such as base, frame, lock-up and fixing. Each payment is made after that stage is complete.
Lenders set their own rules on the number of drawdowns, inspection requirements and fees, so the schedule in your building contract needs to line up with what your lender will fund. Queensland building law also sets limits on what a builder can claim. The maximum deposit is 5 per cent for contracts of $20,000 or more. A builder cannot claim more than 50 per cent of the contract price, including the deposit, until at least 50 per cent of the on-site work is complete. Payments must also relate to the work completed.
That is why a builder's invoice should match the actual stage reached on site. Paying early can reduce your protection under the Queensland Home Warranty Scheme.
Do You Pay Interest on the Full Loan During the Build?
Interest is generally charged on the amount drawn down so far, not on the full approved loan, but confirm this with your lender. The balance grows as each stage is paid, so repayments may rise through the build.
Terms differ between lenders, including the type of repayment during construction. As an illustration only, using an example rate of 6.75% p.a., interest on $200,000 drawn would be about $13,500 a year, or roughly $1,125 a month. When $400,000 has been drawn at the same rate, interest would be about $27,000 a year, or roughly $2,250 a month. These figures are for illustration and your actual rate will depend on your lender and your deposit size.
The cost of staying in a rental or paying off other debts during this time also needs to fit your budget. You can test your numbers with our borrowing capacity tools.
Ready to get started?
Book a chat with a Mortgage Broker at Financial Scope Brokers today.
Example: A Mermaid Beach Knock-Down Build From Settlement to Handover
This example is illustrative only, lender requirements differ, and it describes an owner-occupier. Consider a couple who own a Mermaid Beach home and plan to demolish it and build a new one to live in. They already hold the land, so there is no land settlement. Their lender values the land, assesses the building contract and approves a loan that covers the build costs.
The builder claims a deposit first, then payments at base, frame, lock-up, fixing and completion. In this example, the lender arranges a progress inspection to confirm the work matches the claim before a release. When the frame stage is claimed, the inspector finds the work complete, and the lender pays the builder directly. The couple's interest charge increases as the drawn balance rises.
The couple had agreed in advance on a monthly buffer for interest, and a short wait at one inspection did not cause them problems. At handover, the final payment is released and the loan moves to a standard home loan structure. This is often called a construction to permanent loan, and your lender can confirm how the switch works for their product.
The trade-off is that you carry the cost of rent or another home while the build runs, and delays can extend that.
What Your Builder Needs Before the First Payment
Lender requirements vary. As examples, a lender may ask for a signed building contract, council plans and council approval before releasing the first payment, along with evidence your builder is registered and insured. Ask early.
In Queensland, the Home Warranty Scheme and the builder's licence matter, and a contractor's insurance should be in place before work starts. Your broker can check what your chosen lender wants so the paperwork is ready before the first claim arrives.
A fixed price building contract gives you a set price, but variations you request can add to it, and those may need lender sign-off. A cost plus contract is more flexible but leaves cost less certain, which some lenders view more cautiously. If you are buying a block as a first step, our first home buyers page explains what support may apply.
Can You Use a First Home Owner Grant When Building?
The Queensland grant is for first home buyers, who must meet the Queensland Revenue Office's eligibility and occupancy conditions. It is generally not available to people who already own a home or land, so many readers planning a knock-down rebuild on land they own are unlikely to qualify. Check the conditions with the Queensland Revenue Office before signing a contract.
Because the grant interacts with your loan amount and deposit, discuss timing with your broker before you commit to a contract.
Costs and Risks to Plan For Before Settlement
The main risks are cost overruns, delays and unexpected fees. Build a buffer into your plan so a variation or a longer build does not put pressure on repayments.
Lenders may charge fees for each drawdown or inspection, and these vary by lender. Building Commission NSW gives $250 to $500 as an indicative cost of each progress inspection, while Queensland costs depend on the lender, so ask your lender how they are charged. If your finances change, a loan health check after the build can help you review your options once the home is complete.
Financial Scope Brokers can access construction loan options from a panel of banks and lenders, and we can explain how each one handles drawdowns before you sign a building contract. If you are in the area, see our mortgage broker in Mermaid Beach page.
Call one of our team or book an appointment at a time that works for you, and we will map out your construction loan settlement from land to handover.
Frequently Asked Questions
What is construction loan settlement?
It is the process where the lender pays for any land purchase, then releases money to your builder in stages as work is completed. If you already own the land, there is no land settlement. You do not receive the full amount upfront.
Do I pay interest on the whole construction loan during the build?
Interest is generally charged on the amount drawn so far, so repayments may rise as each stage is paid. Terms vary by lender, so confirm with your broker.
What is a construction draw schedule?
It lists the build stages, such as base, frame, lock-up and fixing, at which the lender releases funds. Each payment follows completed work, and some lenders require an inspection.
Can I get a first home owner grant for a new build in Queensland?
The Queensland grant is for first home buyers who meet the Queensland Revenue Office's eligibility and occupancy conditions. It is generally not available to people who already own a home or land. Check the conditions before signing your contract.